|
|
Glossary of Terms![]() APC: Adjusted Production Cost Capacity Factor: The net capacity factor of a power plant is the ratio of the actual output of a power plant over a period of time and its potential output if it had operated at full nameplate capacity the entire time. Typical capacity factor for wind power: 20-40% DPI: Definitive Point of Interconnection DPP: Definitive Planning Phase FAC: Federal Advisory Council FERC: Federal Energy Regulatory Commission FeS: Feasibility Study FS: Facility Study GIP: Generation Interconnection Projects IC: Interconnection Customer IR: Interconnection Request ISO: Independent System Operators MTEP: Midwest Transmission Expansion Plan MVP: Multi-Value Project Nameplate Capacity: Rated Power Output Capacity (stated on the package) OATT: Open Access Transmission Tariff Pancaking: Fees that are tacked on as electricity flows through a number of transmission systems POI: Point of Interconnection Postage Stamp: Flat rates charged for transmission service without regard to distance PJM: Pennsylvania, Jersey, Maryland PRM: Planning Reserve Margin RES: Renewable Energy Standard RERP: Renewable Energy Resources Program RPS: Renewable Portfolio Standards RGOS: Regional Generation Outlet Study RTO: Regional Transmission Operators SIS: System Impact Study SPA: System Planning & Analysis Tariff: Document listing the terms and conditions, including a schedule of prices, under which utility services will be provided. © 2013 Wind on the Wires, All Rights Reserved
|
|
Hot Off The Wire
State's Renewable Energy Fund Lacks Power to Fulfill Purpose Read More » MidAmerican's wind energy project is $1.9 billion windfall for Iowa Read More » Clean Energy & Jobs Campaign Rally is Huge Success Read More » Utilities fight proposal that could lower your bill Read More » Americans Want More Emphasis on Solar, Wind, Natural Gas Read More » Wind Power as a Long-Term Natural Gas Hedge Read More » Not a Member? Want to know more?
Already a Member? Need web access?
|
